• POWER RESTORATION UPDATE

    As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 11:30 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 10:12 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more

  • ANTI-PILFERAGE ACT (RA 7832)

    ‘An act penalizing the pilferage of electricity and theft of power transmission lines/materials, rationalizing system losses by phasing out pilferage losses as a component thereof, and for other purposes.’ Ang layi wala nagapahanugot sang masunod: FLYING CONNECTION – Pag-angot sang linya sang kuryente sa iban nga balay nga may metro ukon kuntador. TAMPERING – Pagkuti/pagbutang Read more

  • Ka MCO! Yari ang Tips sa pag-boto this 2025 MIDTERM ELECTION.

    Read more

  • PRESS RELEASE

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig. Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III: • Read more

  • PUBLIC ADVISORY HOLIDAY NOTICE

    2025 MIDTERM ELECTION – MAY 12, 2025 (MONDAY) MAIN OFFICE AND AREA OFFICES – CLOSED ASSIGNED MAINTENANCE CREW ARE AVAILABLE AT AREA OFFICES TO ADDRESS YOUR CONCERNS/ COMPLAINTS. REGULAR OFFICE HOUR WILL RESUME ON MAY 13, 2025 (TUESDAY) MADAMO GID NGA SALAMAT SA INYO PAGHANGUP. Read more

  • ITB 2404, S. 2024

    Refurbishment of Roofing, Glass Counters and Repainting of Sara Area Office. Read more

  • ITB 2403, S. 2024

    Procurement and Supply of Six (6) Units Service Vehicle for Maintenance Use in Area Offices. Read more

  • ITB 2402, S. 2024

    Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditures Read more