• UNSCHEDULED POWER INTERRUPTION (JUNE 26, 2023)

    Date: June 26, 2023 Time of interruption: 9:20 AM Time of restoration: 10:16 AM Affected area: Zerrudo, Sara, Iloilo Activities: Replaced cut-out and repaired distribution transformer loose connection We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 26, 2023)

    Date: June 26, 2023 (Monday) Time of interruption: 7:00 AM Time of restoration: 9:15 AM Affected areas: Lanciola, Crespo and Bakabak (portion), Sara, Iloilo Activity: Replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • KANSELADO ANG CORRECTIVE MAINTENANCE SANG NGCP SA HUNYO 25, 2023

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ang CORRECTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa HUNYO 25, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang KANSELADO nga power interruption amo ang masunod: HUNYO 25, 2023 (DOMINGO)6:00 AM- 6:00 PM (12 ka oras ang kalawigon)• ANILAO• BANATE• Read more

  • ANTI-PILFERAGE ACT (RA 7832)

    ‘An act penalizing the pilferage of electricity and theft of power transmission lines/materials, rationalizing system losses by phasing out pilferage losses as a component thereof, and for other purposes.’ Ang layi wala nagapahanugot sang masunod: FLYING CONNECTION – Pag-angot sang linya sang kuryente sa iban nga balay nga may metro ukon kuntador. TAMPERING – Pagkuti/pagbutang Read more

  • Ka MCO! Yari ang Tips sa pag-boto this 2025 MIDTERM ELECTION.

    Read more

  • PRESS RELEASE

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig. Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III: • Read more

  • PUBLIC ADVISORY HOLIDAY NOTICE

    2025 MIDTERM ELECTION – MAY 12, 2025 (MONDAY) MAIN OFFICE AND AREA OFFICES – CLOSED ASSIGNED MAINTENANCE CREW ARE AVAILABLE AT AREA OFFICES TO ADDRESS YOUR CONCERNS/ COMPLAINTS. REGULAR OFFICE HOUR WILL RESUME ON MAY 13, 2025 (TUESDAY) MADAMO GID NGA SALAMAT SA INYO PAGHANGUP. Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more