• NGCP MANUAL LOAD DROPPING

    Ginapahibalo ang tanan nga mga katapo-konsumidores sang ILECO III nga naga-implementar sang ROTATING POWER INTERRUPTION ang aton Kooperatiba bangud sang MANUAL LOAD DROPPING (MLD) sang National Grid Corporation of the Philippines (NGCP). Ang apektado sang rotational power interruption amo ang mga masunod nga lugar:ANILAO, BANATE, BAROTAC VIEJO, SAN RAFAEL, AJUY, SARA, LEMERY, CONCEPCION, SAN DIONISIO, Read more

  • UPDATE ON UNSCHEDULED POWER INTERRUPTION As of April 27, 2023, 9:30 PM

    ILECO III Technical Team is still coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. We apologize for the inconvenience. For your information. Read more

  • UPDATE ON UNSCHEDULED POWER INTERRUPTION As of April 27, 2023, 7:45 PM

    ILECO III Technical Team is still coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. We apologize for the inconvenience. For your information. Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more