
POWER RATES
POWER ADVISORIES
Date: September 13, 2022 Time of interruption: 3:35 PM Time of Restoration: 4:45 PM Affected Area: Area from Dugman – Canas, San Dionisio Activity: Inspection of line and replaced fuselink We apologize for the inconvenience. For your information. Read more
Date: September 13, 2022 Time of interruption: 3:35 PM Time of Restoration: 4:56 PM Affected Area: Sitio Lampuyang and Sitio Danmar, Sitio Puros and Sitio Baculod, Libertad, Banate Activity: Inspection and clearing of lines due to vegetation. We apologize for the inconvenience. For your information. Read more
Date: September 12, 2022 Time of interruption: 9:38 AM Time of Restoration: 5:00 PM Affected Area: Brgy. Moto, San Dionisio Activity: Replacement and relocation of rotten poles (2) structure. Installation and rehabilitation of SDI and kWhr Meter in cooperation with our third party contractor (NIGSECO). We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
BIDS AND NOTICES
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more
Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more