• UPDATE

    Power restored at 1:36 PM. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 16, 2023)

    Date: January 16, 2023 (Monday) Time of power interruption: 5:30 AM Time of restoration: Not yet determined Affected areas: Devera, Posadas, Aldeguer and Castor, Sara, Iloilo and Whole Municipality of San DionisioReason: Toppled pole in Brgy. Devera, Sara, Iloilo Our maintenance team is currently checking the lines for power restoration. We apologize for the inconvenience.… Read more

  • INSERTING OF 30 FOOTER STEEL POLE IN BRGY. ALEMAÑA, LEMERY

    LOOK: ILECO III personnel conducted inserting of 30 footer steel pole due sagging of secondary and neutral line at Almeñana, Lemery, Iloilo today, January 13, 2023. (No Power Interruption Occurred) For your information. Read more

  • ENERGY CONSERVATION TIPS

    Ka-MCO! Looking for ways to save energy and money at home? Take a look at these Energy Conservation Tips we have put together, they could help you in reducing your monthly bills. Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN BAROTAC VIEJO, ILOILO

    ILECO III conducted On-site Pre-Membership Seminar (PMS) participated by 33 attendees from barangays of Bugnay and California held in Brgy. California, Barotac Viejo, Iloilo on October 16, 2024 (Wednesday). The said meeting was attended by Dir. Harry G. Tupas. This activity is made possible with the support of ILECO III BODs and Management Committee headed… Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN PASIG, SARA, ILOILO

    ILECO III conducted On-site Pre-Membership Seminar (PMS) participated by 54 attendees in Brgy. Pasig, Sara, Iloilo on October 16, 2024 (Wednesday). The said meeting was attended by Punong Barangay Hon. Gina Dela Cruz. This activity is made possible with the support of ILECO III BODs and Management Committee headed by our General Manager, Atty. James… Read more

  • ANO ANG RA 11552?

    An Act Extending and Enhancing the Implementation of the Lifeline Rate, Amending for the Purpose, Section 73 of Republic Act No. 9136, Otherwise known as the ‘Electric Power Industry Reform Act of 2001’ as Amended by Republic Act No. 10150 1. Ano ang Lifeline Rate kag ano ang benepisyo sa mga kwalipikado nga mga kunsomidor?… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more