• UPDATE ON NGCP’S EMERGENCY POWER INTERRUPTION (As of 7:30 a.m.)

    Pahibalo sa mga katapo-konsumidores nga padayon sa gihapon ang pag-ubra sang National Grid Corporation of the Philippines (NGCP) sa pag trouble shoot sang circuit breaker sa NGCP Concepcion Substation. Sa sini nga bahin, ang power supply wala nabalik sa aton nga distribution lines sa natalana nga schedule kaina nga alas 7:00 sang aga. Padayon ang… Read more

  • SCHEDULED MANUAL LOAD DROPPING SANG NPC SA GIGANTES ISLAND

    Pahibalo sa mga katapo-konsumidores sa Gigantes Island sa mga nagluntad nga Power Interruption umpisa sang ABRIL 26, 2022 nga ini ang may kaangtangan sa Scheduled Manual Load Dropping sang National Power Corporation (NPC). Base sa sulat nga nabaton sang opisina halin sa NPC sang ABRIL 27, 2022, ang nasambit nga power load dropping ang ginpatigayon… Read more

  • NGCP’S EMERGENCY POWER INTERRUPTION ON APRIL 29, 2022

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa Abril 29, 2022 (Biyernes), 5:00 AM- 7:00 AM (duwa ka oras ang kalawigon) para sa pagkay-o sang guba nga insulator sa ila transmission line. Ang apektado nga lugar sang power interruption amo ang masunod:SARALEMERYAJUYCONCEPCIONSAN DIONISIOBATADESTANCIABALASANCARLES Ang NGCP… Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN PUNTA, CARLES, ILOILO

    ILECO III conducted On-site Pre-Membership Seminar (PMS) participated by 56 attendees in Brgy. Punta, Carles, Iloilo on October 17, 2024 (Thursday). The said meeting was attended by Dir. Lope O. Salmorin. This activity is made possible with the support of ILECO III BODs and Management Committee headed by our General Manager, Atty. James G. Balsomo… Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN LUMBIA, ESTANCIA, ILOILO

    ILECO III conducted On-site Pre-Membership Seminar (PMS) participated by 57 attendees in Brgy. Lumbia, Estancia, Iloilo on October 17, 2024 (Thursday). The said meeting was attended by Dir. Lope O. Salmorin. This activity is made possible with the support of ILECO III BODs and Management Committee headed by our General Manager, Atty. James G. Balsomo… Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN BAROTAC VIEJO, ILOILO

    ILECO III conducted On-site Pre-Membership Seminar (PMS) participated by 84 attendees from barangays of La Fortuna, San Antonio and Ugasan held in Brgy. La Fortuna, Barotac Viejo, Iloilo on October 17, 2024 (Thursday). The said meeting was attended by Dir. Harry G. Tupas. This activity is made possible with the support of ILECO III BODs… Read more

  • ANO ANG RA 11552?

    An Act Extending and Enhancing the Implementation of the Lifeline Rate, Amending for the Purpose, Section 73 of Republic Act No. 9136, Otherwise known as the ‘Electric Power Industry Reform Act of 2001’ as Amended by Republic Act No. 10150 1. Ano ang Lifeline Rate kag ano ang benepisyo sa mga kwalipikado nga mga kunsomidor?… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more