• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 4:15 AM Time of Restoration: 7:00 AM Affected Area: Binuluangan and Tabugon Island, Carles Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 6, 2022)

    Date: September 6, 2022 Time of interruption: 5:45 PM Time of Restoration: 6:00 PM Affected Area: Sitio Carrida, San Lucas, Barotac Viejo Activity: Repair secondary load due to loose connection of side DX Transformer Supply 37.5 kVa and private transformer load side connection. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 6, 2022)

    Date: September 6, 2022 Time of interruption: 5:25 PM Time of Restoration: 5:53 PM Affected Area: Cabalic and Batuan, Balasan Activity: Inspection of lines and replaced busted fuselink. We apologize for the inconvenience. For your information. Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more