• UNSCHEDULED POWER INTERRUPTION (JUNE 12, 2022)

    Date: June 12, 2022 Time of interruption: 5:10 PM Time of restoration: 5:50 PM Affected area: San Dionisio, San Rafael, Iloilo Activity: Replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 12, 2022)

    Date: June 12, 2022 Time of interruption: 4:31 PM Time of restoration: 5:15 PM Affected area: Sitio Hacienda Rica, Badiang, Anilao, Iloilo Activity: Refusing primary cut-out We apologize for the inconvenience. For your information. Read more

  • ENERGY CONSERVATION TIPS!

    AIR CONDITIONING UNIT Buy an aircon with high Energy Efficiency. Ratio indicated in the yellow label. Change or clean your AC’s air filters regularly. Block the sun from overheating your home. Inside, use shades, blinds and drapes.Outside, use awnings, trees and shrubs. Repair leaky ducts to reduce heating and cooling costs. Decorate for a cooler… Read more

  • ILECO III ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. *A friendly reminder from ILECO III. Read more

  • IEC IN BRGY. ROJAS, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) Program to 85 MCOs in Brgy. Rojas, Ajuy, Iloilo on May 20, 2022 (Friday). *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • RE-SAGGING OF SECONDARY LINE IN ALAPASCO, BATAD

    ILECO III Technical Team conducts re-sagging of secondary line in Brgy. Alapasco, Batad, Iloilo on May 20, 2022 (Friday). For your information. Read more

  • ILECO III ENERGY SAVING TIP

    Pagsiguro sang maayo nga insulation sang mga connection sang kuryente sa balay. *A friendly reminder from ILECO III. Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more