• POWER RESTORATION IN BRGY. CUBAY, SAN DIONISIO

    ILECO III conducted power restoration of Three (3) units of 25kVA Transformer of NSDMPC at Brgy. Cubay, San Dionisio, Iloilo today, January 12, 2023. For your information. Read more

  • SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA ENERO 15, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga LOAD TRANSFER kag SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA TR1 sa Concepcion Substation sa ENERO 15, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod:4:00 AM- 5:00 AM (1 ka oras ang… Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 10, 2023)

    Date: January 10, 2023 Time.of interruption: 8:09 PM Time of restoration: 8:43 PM Affected area: St. Therese Village, Dayhagan, Carles, Iloilo Activity: Repaired secondary neutral bushing loose connection of transformer We apologize for the inconvenience. For your information. Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting. Clean the condenser tube regularly. Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened. Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.… Read more

  • Happy birthday HON. RAUL “BOBOY” C. TUPAS, Congressman- 5th District of Iloilo

    From ILECO III Family! Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • ONGOING BASIC LINEMEN TRAINING COURSE HELD AT ILECO III (WEEK 3)

    The start of the actual preparations and exercises on the Basic Linemen Training Course (Week 3) were the following: 1. Pole hauling2. Hole digging3. Grounding4. Pole erection5. Guying6. Anchoring7. Pole climbing exercises8. Pole dressing9. Stringing10. Tensioning, Armouring, Tying Activities mentioned above were just the first part of the rigorous trainings of the trainees to equip… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more