
POWER RATES
POWER ADVISORIES
Date: March 30, 2023 Time of interruption: 9:30 AM Time of restoration: 10:40 AM Affected area: Nipa, San Salvador, Banate, Iloilo Activities: Repaired open secondary and installed down guy We apologize for the inconvenience. For your information. Read more
DATE: March 30, 2023 Time of interruption: 10:04 AM Time of restoration: 10:25 AM Affected areas: AJUY FEEDER 2 Cause of interruption: Line fault due to animal contact We apologize for the inconvenience. For your information. Read more
Pahibalo sa mga katapo-konsumidores nga may serye sang SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang mga masunod: ABRIL 03, 2023 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)SARA• AranteSAN DIONISIO• Sua• Tiabas• Tuble • Pangi ABRIL… Read more
NEWS AND UPDATES
The minimal INCREASE for Residential Consumers for the Month of June 2022 compared to the previous month is due to the increase in Transmission Charge. The drastic increase of the said charge was triggered by 47.29% increase of Ancillary Service Charge from 2.9M PhP (April 2022 power bill) to 4.3M PhP (May 2022 power bill)… Read more
To honor our Dad/Tatay/Papa this Father’s Day, join our FATHER’S DAY SPECIAL and win exciting prizes! HOW TO JOIN:1. Share with us below your best photo with your father or father figure.2. Tag/Mention him.3. Tell us one special thing about him.4. And make sure to use #ILECO3FathersDay in your caption for your entry tobe officially counted. Five… Read more
For your information. Read more
Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III: • Valid… Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more