
POWER RATES
POWER ADVISORIES
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
Time of interruption: 6:54 p.m.Estimated time of power restoration: Not yet determinedAffected Areas: Whole coverage area of ILECO III Our Technical Team is currently coordinating with NGCP for the cause of this power interruption which affected the ENTIRE PANAY ISLAND and MOST PARTS of NEGROS ISLAND. The estimated time of power restoration cannot be determined… Read more
NEWS AND UPDATES
Effective June 16, 2022, ILECO III installs new General Manager, Atty. James G. Balsomo II. ILECO III Officers, Management and Employees warmly welcome GM Balsomo as part of the family. GM Balsomo shares his insights and words of wisdom during the program and looks forward in working with the entire ILECO III workforce to achieve… Read more
The roving community pantry of ILECO III “Love on Wheels” goes to Brgy. Bacolod, Balasan, Iloilo on June 15, 2022 (Wednesday). ILECO III prepared grocery items and packs of rice and generously extended assistance to one hundred forty five (145) member-consumer-owners (MCOs) of the said barangay. It was assisted by Dir. Jeo B. Bandojo, ISD… Read more
For the information of our beloved Member-Consumer-Owners (MCOs) and Stakeholders, effective June 16, 2022 (Thursday), ILECO III has a new General Manager, Atty. James G. Balsomo II. Congratulations GM Balsomo! Read more
The minimal INCREASE for Residential Consumers for the Month of June 2022 compared to the previous month is due to the increase in Transmission Charge. The drastic increase of the said charge was triggered by 47.29% increase of Ancillary Service Charge from 2.9M PhP (April 2022 power bill) to 4.3M PhP (May 2022 power bill)… Read more
BIDS AND NOTICES
Procurement of 4X4 Pick Up Vehicle for Area Offices and Utility Van for Main Office Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loan, and Maintenance Use Read more