• SCHEDULED POWER INTERRUPTION SA BANWA SANG BALASAN KAG CARLES SA SETYEMBRE 29, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 29, 2024 (DOMINGO), 5:00 AM-6:00 PM (13 ka oras ang kalawigon) para sa patigayunon nga Preventive Maintenance sa Pani-an Substation, clearing sang linya, kag pag-ilis sang poste. Ang lugar nga apektado sang sini nga power interruptions amo ang masunod: • CARLES… Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG ESTANCIA, BATAD, CARLES KAG BALASAN SA SETYEMBRE 28, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 28, 2024 (SABADO), 5:00 AM-6:00 PM (13 ka oras ang kalawigon) para sa patigayunon nga Preventive Maintenance sa Daan Banwa Substation, clearing sang linya, pag-ilis sang poste kag pag convert sang linya. Ang lugar nga apektado sang sini nga power interruptions… Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: September 21, 2024 (Saturday) Time of interruption: 6:35 AM Time of restoration: 7:56 AM Affected area: Municipality of Carles Cause: Damage of Pole Number 73 on its Pin Insulator Activity: Pole to Pole Inspection and replaced damage pin insulator For your information. Read more

  • HAPPY FATHER’S DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. celebrates Father’s Day, June 19, 2022 Happy Father’s Day to all (Tatay, Papa, Dad, Erpat) Read more

  • Happy Father’s Day sa tanan nga mga Tatay, Papa kag Daddy!

    Kamo ang matuod nga kusog kag haligi sang aton mga puluy-an. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3CorporateSocialResponsibility#ILECO3ServiceBeyondElectricity ILECO III distributed tokens to honor the contribution of all Fathers in the society. *Masks were removed for documentation purposes only. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • IEC PROGRAM AND BAPA GENERAL ASSEMBLY IN SITIO HAMBAD, VISTA ALEGRE, BAROTAC VIEJO

    ILECO III personnel conducted Information Education Campaign (IEC) Program and BAPA General Assembly in Sitio Hambad, Vista Alegre, Barotac Viejo, Iloilo attended by 75 MCOs on June 17, 2022 (Friday). For your information. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more