• SCHEDULED POWER INTERRUPTION SA BANWA SANG BANATE SA SETYEMBRE 6, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 06, 2023 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang BANATE amo ang masunod:• Poblacion (portion)• Bularan (portion)• Talokgangan• San Salvador… Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 2, 2023)

    Date: September 02, 2023 (Saturday) Time of interruption: 6:05 AM Estimated time of restoration: NOT YET DETERMINED Affected Areas: All barangays in San Rafael, Iloilo Cause/Reason: Damaged poles and lines due to vehicle accident Our technical team is currently preparing for immediate power restoration. We apologize for the inconvenience. For your information. Read more

  • EMERGENCY POWER INTERRUPTION (SEPTEMBER 1, 2023)

    Date: September 1, 2023 (Friday) Time of interruption: 7:00 AM Time of Restored: 7:30 AM Activity: Inspection of line and re-fusing primary cut-out. Affected areas: Poblacion, Barotac Viejo We apologize for the inconvenience. For your information. Read more

  • ILECO III ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. *A friendly reminder from ILECO III. Read more

  • FEAST OF SAN JUAN DE BAUTISTA

    ILOILO III ELECTRIC COOPERATIVE, INC. celebrates with Saranhon and Banatenhon for their celebration of Feast of San Juan de Bautista an Annual Town Fiesta, June 24, 2022. Read more

  • IEC AND BAPA RE-ORGANIZATION IN BULAK SUR, BATAD

    ILECO III personnel conducted Information Education Campaign (IEC) Program and BAPA Re-Organization in Bulak Sur, Batad, Iloilo attended by 65 MCOs on June 22, 2022 (Wednesday). For your information. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • ILECO III ENERGY SAVING TIP

    Pag-gamit sang natural light sa baylo sang mga suga. *A friendly reminder from ILECO III. Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more