• Causes of unscheduled power interruptions occurred on ILECO III coverage area

    For your information. Sara Area Coverage – July 28 – August 2, 2022 Natividad Area Coverage – July 28 – August 2, 2022 Pani-an Area Coverage – July 27 – 31, 2022 Read more

  • SCHEDULED POWER INTERRUPTION SA AGOSTO 11-12, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-convert kag pag-construct sang Single Phase Line. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: AGOSTO 11, 2022 (HUWEBES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) • Sua, San Dionisio• Tiabas, San Dionisio•… Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 2, 2022)

    Date: August 02, 2022 Time of interruption: 10:15 AM Time of restoration: 1:12 PM Affected areas: Del Pilar and General Luna, Barotac Viejo, Iloilo Activity: Replaced rotten pole and re-sagging of Single Phase Line We apologize for the inconvenience. For your information. Read more

  • ILECO III “LOVE ON WHEELS” GOES TO BRGY. BATITI, CONCEPCION, ILOILO

    The roving community pantry of ILECO III “Love on Wheels” goes to Brgy. Batiti, Concepcion, Iloilo on June 27, 2022 (Monday). ILECO III prepared grocery items and packs of rice and generously extended assistance to one hundred (100) member-consumer-owners (MCOs) of the said barangay. In addition, ILECO III also conducted Information Education Campaign (IEC) Program… Read more

  • ILECO III ENERGY SAVING TIP

    Pag-gamit sang energy efficient nga appliances kag pag-gamit sang mga LED bulbs. *A friendly reminder from ILECO III. Read more

  • IEC AND BAPA GENERAL ASSEMBLY IN HACIENDA RICA, BADIANG, ANILAO

    ILECO III personnel conducted Information Education Campaign (IEC) Program and BAPA General Assembly in Hacienda Rica, Badiang, Anilao, Iloilo attended by15 MCOs on June 24, 2022 (Friday). For your information. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • ILECO III ENERGY SAVING TIP

    Pagsiguro sang maayo nga insulation sang mga connection sang kuryente sa balay. *A friendly reminder from ILECO III. Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more