• UNSCHEDULED POWER INTERRUPTION (JULY 13, 2022)

    Date: July 13, 2022 (Wednesday) Time of interruption: 5:50 AM Time of restoration: 7:45 AM Affected areas: Balunos, Guipis and Manganese, Anilao, Iloilo Cause: Line fault due to animal contact (bat) Activities: Inspection of line and pulled out animal We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 13, 2022)

    Date: July 13, 2022 (Tuesday) Time of interruption: 6:30 AM Time of restoration: 7:31 AM Affected areas: San Rafael (All barangays) and Barotac Viejo (portion) Activity: Repaired source of primary section analyzing cut-out We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 12, 2022)

    Date: July 12, 2022 (Tuesday)Time of interruption: 3:55 PMTime of restoration: 6:27 PM Affected areas: Batad (All barangays) and Estancia (portion) Cause: Primary line cut-off due to bad weather which causes leaning tree to distribution lines We apologize for the inconvenience. For your information. Read more

  • FEAST OF SAN PEDRO DE APOSTOL

    ILOILO III ELECTRIC COOPERATIVE, INC. celebrates with Barotacnon (Viejo) on thier celebration of feast of San Pedro de Apostol, June 29, 2022. Read more

  • ELECTRIC POWER DISTRIBUTION LINE CONSTRUCTION TRAINING COURSE GRADUATION PROGRAM

    The 42-day training of Thirty Three (33) participants, 5 of which are from Guimaras Electric Cooperative, Inc. (GUIMELCO), 10 from Iloilo II Electric Cooperative, Inc. (ILECO II) and 18 from Iloilo III Electric Cooperative, Inc. (ILECO III) has come to an end. ILECO III conducted the Graduation Program for EPDLC Training Course on June 28,… Read more

  • ILECO III ENERGY SAVING TIP

    Kuha-on sa saksakan ang mga appliances nga wala ginagamit. *A friendly reminder from ILECO III. Read more

  • ILECO III “LOVE ON WHEELS” GOES TO BRGY. BATITI, CONCEPCION, ILOILO

    The roving community pantry of ILECO III “Love on Wheels” goes to Brgy. Batiti, Concepcion, Iloilo on June 27, 2022 (Monday). ILECO III prepared grocery items and packs of rice and generously extended assistance to one hundred (100) member-consumer-owners (MCOs) of the said barangay. In addition, ILECO III also conducted Information Education Campaign (IEC) Program… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more