• UNSCHEDULED POWER INTERRUPTION (JULY 18, 2022)

    Date: July 18, 2022 (Monday) Time of interruption: 10:45 AM Time of restoration: 12:25 PM Affected area: NHA Village, Bacjawan Norte, Concepcion (portion) Activity: Installation of private distribution transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULE POWER INTERRUPTION (JULY 18, 2022)

    Date: July 18, 2022 (Monday) Time of interruption: 10:06 AM Time of restoration: 11:15 AM Affected areas: Bobon and Managopaya, Banate, Iloilo Activities: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 18, 2022)

    Date: July 18, 2022 (Monday) Time of interruption: 6:20 AM Time of restoration: 9:40 AM Affected areas: Puerto Princesa and San Francisco, Barotac Viejo, Iloilo Cause: Line fault due to animal contact Activity: Inspection of line and re-fusing primary cut-out We apologize for the inconvenience. For your information. Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III: • Valid… Read more

  • EID’L ADHA

    ILOILO III ELECTRIC COOPERATIVE, INC. joins our Muslim community in observing the Eid’l Adha (Feast of Sacrifice) today July 9, 2022. Read more

  • IEC AND BAPA ASSEMBLY IN DEL CASTILLO, SARA

    ILECO III personnel conducted Information Education Campaign (IEC) Program and BAPA General Assembly in Del Castillo, Sara, Iloilo attended by 60 MCOs on July 07, 2022 (Thursday). For your information. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • Ano ang Manual Load Dropping ukon MLD?

    Ini ang proseso nga kung sa diin gina-buhinan ang power load sa grid bangud sa kakulangan sang supply sang kuryente nga masami matabo kung may mga naguba nga planta kadungan sang pag-taas sang supply sang pag-gamit sang kuryente. Bangud diri, ginapatigayon ang MLD pina-agi sa “rotational brownout” sa nagaka-igo nga oras sa nasakupan nga lugar… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more