
POWER RATES
POWER ADVISORIES
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
Time of interruption: 6:54 p.m.Estimated time of power restoration: Not yet determinedAffected Areas: Whole coverage area of ILECO III Our Technical Team is currently coordinating with NGCP for the cause of this power interruption which affected the ENTIRE PANAY ISLAND and MOST PARTS of NEGROS ISLAND. The estimated time of power restoration cannot be determined… Read more
NEWS AND UPDATES
Diin nagahalin ang aton nga Kuryente? Read more
ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Re-organization Meeting in NHA Barrido, Ajuy, Iloilo with 155 attendees on July 15, 2022 (Friday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more
BIDS AND NOTICES