
POWER RATES
POWER ADVISORIES
ILECO III Technical personnel conducted construction of two (2) span open secondary extension lines at Crossing Alpe, Guinticgan, Carles today, October 6, 2022 (Thursday). Keep safe Warriors of Light For your information. Read more
Date: October 6, 2022 Time of interruption: 9:30 AM Time of Restoration: 11:32 AM Affected Area: Manganese, Guipis and Balunos, Anilao Activity: Inspection of lines and replaced fuse link We apologize for the inconvenience. For your information. Read more
Date: October 6, 2022 Time of interruption: 12:20 AM Time of Restoration: 3:00 AM Affected Area: Magsaysay St., Poblacion, Barotac Viejo Activity: Inspection/clearing of neutral wire down due to vegetation We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
Sa pinaka-una nga kahigayunan, ginkilala ang ILECO III bilang BEST PERFORMING ELECTRIC COOPERATIVE (ON-GRID) sa bilog nga Pilipinas sang National Electrification Administration (NEA) sa masobra 121 ECs sang tuig 2021. Dugang pa diri, ginkilala man ang tanan nga ECs sa Region VI sa padayon nga pag-sustenir sang Triple A Category. Ini ang pinakamataas nga Categorization… Read more
The roving community pantry of ILECO III “Love on Wheels” goes to Brgy. Cag-an, Anilao. Iloilo on July 18, 2022 (Monday). ILECO III prepared grocery items and packs of rice and generously extended assistance to one hundred fifty (150) member-consumer-owners (MCOs) of the said barangay. It was assisted by Dir. Lanie J. Velasco, MSD Chief… Read more
Are you planning to transfer the Meter Name to your own name since the owner is no longer residing or he/she is already deceased? Here’s how to process Change of Name Read more
Happy birthday HON. ULYSSES L. VALDEZ, Vice Mayor- Barotac Viejo, Iloilo. From ILECO III Family! Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more