
POWER RATES
POWER ADVISORIES
*Update on NGCP’s scheduled power interruption Power has been restored in Natividad Area Coverage Time of power restoration:Natividad Area Coverage: 6:06 PM We apologize for the inconvenience. Thank you for your understanding. Read more
ILECO III Technical personnel conducted reconnection of pulled out kWhr Meter and replaced meter base loose connection at Brgy. Hall, Caw-I, Batad today, October 15, 2022 (Saturday). Keep safe Warriors of Light For your information. Read more
*Update on NGCP’s unscheduled power interruption Power has been restored to all affected areas in our coverage. Time of power restoration as follows:Natividad Area Coverage: 3:13 a.m.Sara Area Coverage: 3:17 a.m.Panian Area Coverage: 3:17 a.m We apologize for the inconvenience. Thank you for your understanding. Read more
NEWS AND UPDATES
Sa pinaka-una nga kahigayunan, ginkilala ang ILECO III bilang BEST PERFORMING ELECTRIC COOPERATIVE (ON-GRID) sa bilog nga Pilipinas sang National Electrification Administration (NEA) sa masobra 121 ECs sang tuig 2021. Dugang pa diri, ginkilala man ang tanan nga ECs sa Region VI sa padayon nga pag-sustenir sang Triple A Category. Ini ang pinakamataas nga Categorization… Read more
The roving community pantry of ILECO III “Love on Wheels” goes to Brgy. Cag-an, Anilao. Iloilo on July 18, 2022 (Monday). ILECO III prepared grocery items and packs of rice and generously extended assistance to one hundred fifty (150) member-consumer-owners (MCOs) of the said barangay. It was assisted by Dir. Lanie J. Velasco, MSD Chief… Read more
Are you planning to transfer the Meter Name to your own name since the owner is no longer residing or he/she is already deceased? Here’s how to process Change of Name Read more
Happy birthday HON. ULYSSES L. VALDEZ, Vice Mayor- Barotac Viejo, Iloilo. From ILECO III Family! Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more