
POWER RATES
POWER ADVISORIES
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
Time of interruption: 6:54 p.m.Estimated time of power restoration: Not yet determinedAffected Areas: Whole coverage area of ILECO III Our Technical Team is currently coordinating with NGCP for the cause of this power interruption which affected the ENTIRE PANAY ISLAND and MOST PARTS of NEGROS ISLAND. The estimated time of power restoration cannot be determined… Read more
NEWS AND UPDATES
The roving community pantry of ILECO III “Love on Wheels” goes to Brgy. Cag-an, Anilao. Iloilo on July 18, 2022 (Monday). ILECO III prepared grocery items and packs of rice and generously extended assistance to one hundred fifty (150) member-consumer-owners (MCOs) of the said barangay. It was assisted by Dir. Lanie J. Velasco, MSD Chief… Read more
Are you planning to transfer the Meter Name to your own name since the owner is no longer residing or he/she is already deceased? Here’s how to process Change of Name Read more
Happy birthday HON. ULYSSES L. VALDEZ, Vice Mayor- Barotac Viejo, Iloilo. From ILECO III Family! Read more
BIDS AND NOTICES
Procurement of 4X4 Pick Up Vehicle for Area Offices and Utility Van for Main Office Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loan, and Maintenance Use Read more