
POWER RATES
POWER ADVISORIES
ILECO III Technical Team repaired primary jumper loose connection in Ma. Theresa Homes Subdivision, Brgy. Aspera, Sara, Iloilo today, April 04, 2022 (Monday). For your information. Read more
Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III subong nga adlaw, ABRIL 04, 2022 (LUNES), 12:00 NN- 1:00 PM (isaka oras ang kalawigon) para sa ubra sang “Hot Spot Correction” sang Sara Feeder 3 sa Brgy. Preciosa, Sara, Iloilo. Ang lugar nga apektado sang sini nga power interruption sa Sara amo… Read more
STATUS: RESTOREDDate: April 01, 2022 (Friday)Time of interruption: 12:41 PMTIME OF RESTORATION: 2:48 PMAffected areas: ALL BARANGAYS IN LEMERYSARA – Apelo and Villahermosa onlyCause of power outage: Line fault due to obstruction of Telco Lines We apologized for the inconvenience. For your information. Read more
NEWS AND UPDATES
Sa pinaka-una nga kahigayunan, ginkilala ang ILECO III bilang BEST PERFORMING ELECTRIC COOPERATIVE (ON-GRID) sa bilog nga Pilipinas sang National Electrification Administration (NEA) sa masobra 121 ECs sang tuig 2021. Dugang pa diri, ginkilala man ang tanan nga ECs sa Region VI sa padayon nga pag-sustenir sang Triple A Category. Ini ang pinakamataas nga Categorization… Read more
The roving community pantry of ILECO III “Love on Wheels” goes to Brgy. Cag-an, Anilao. Iloilo on July 18, 2022 (Monday). ILECO III prepared grocery items and packs of rice and generously extended assistance to one hundred fifty (150) member-consumer-owners (MCOs) of the said barangay. It was assisted by Dir. Lanie J. Velasco, MSD Chief… Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more