• INSTALLATION OF POLE GROUNDING IN BAROTAC VIEJO

    ILECO III Technical Team conducts installation of pole grounding in Barotac Viejo, Iloilo on May 24, 2022 (Tuesday). For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 24, 2022)

    Date: May 24, 2022 Time of interruption: 7:55 AM Time of restoration: 8:45 AM Affected area: Cawayan Sulod, Carles, Iloilo Activity: Inspection of line and replaced busted fuse Link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 23, 2022)

    Date: May 23, 2022 (Monday) Time of interruption: 7:00 PM Time of restoration: 7:34 PM Affected area: Daan Banwa, Estancia, Iloilo Activity: Repaired secondary bushing jumper of transformer We apologize for the inconvenience. For your information. Read more

  • How to pay you bills using GCash Account?

    Read more

  • IEC AND BAPA ASSEMBLY IN SAN DIONISIO, SAN RAFAEL

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in San Dionisio, San Rafael, Iloilo with 37 attendees on July 19, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • IEC AND BAPA ASSEMBLY MEETING IN NHA VILLAGE, BADIANG, ANILAO

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Badiang, Anilao, Iloilo with 84 attendees on July 19, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, BAGACAY, SAN DIONISIO

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Bagacay, San Dionisio, Iloilo with 64 attendees on July 20, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more