
POWER RATES
POWER ADVISORIES
Date: May 16, 2023 Time of interruption: 10:30 AM Time of restoration: 11:10 AM Affected area: Poblacion Market, Sara, Iloilo (portion) Activity: Installed 50 kVA distribution transformer We apologize for the inconvenience. For your information. Read more
Date: May 11, 2023 Time of interruption: 12:15 PM Time of restoration: 1:45 PM Affected area: Culasi, Ajuy, Iloilo (portion) Activity: Replacement of rotten pole We apologize for the inconvenience. For your information. Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-patigayon sang technical activities. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang CARLES amo ang masunod: MAY 12, 2023 (BIYERNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)• Brgy. Granada• Brgy. Asluman MAY 13,… Read more
NEWS AND UPDATES
ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Bagacay, San Dionisio, Iloilo with 64 attendees on July 20, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more
Sa pinaka-una nga kahigayunan, ginkilala ang ILECO III bilang BEST PERFORMING ELECTRIC COOPERATIVE (ON-GRID) sa bilog nga Pilipinas sang National Electrification Administration (NEA) sa masobra 121 ECs sang tuig 2021. Dugang pa diri, ginkilala man ang tanan nga ECs sa Region VI sa padayon nga pag-sustenir sang Triple A Category. Ini ang pinakamataas nga Categorization… Read more
BIDS AND NOTICES
15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more
Procurement of Boom Truck Read more