
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED CORRECTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA Transformer No. 2 sa Dingle Substation kag ILECO III para sa patigayunon nga technical activities sa OKTUBRE 08, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: OKTUBRE… Read more
Date: October 3, 2023 (Tuesday) Time of interruption: 9:00 AM Estimated time of restoration: 9:45 AM Affected Area/s: Portion of San Geronimo, Barotac Viejo Activity: Installed additional transformer at Brgy. San Geronimo We apologize for the inconvenience. For your information. Read more
For your information. Read more
NEWS AND UPDATES
Here’s the requirements on how to Change of NameĀ Read more
ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in San Dionisio, San Rafael, Iloilo with 37 attendees on July 19, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more
ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Badiang, Anilao, Iloilo with 84 attendees on July 19, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more
BIDS AND NOTICES
Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more