• UNSCHDEULED POWER INTERRUPTION (JUNE 16, 2022)

    Date: June 16, 2022 Time of interruption: 9:40 AM Time of restoration: 12:00 NN Affected area: DB Onate St., Poblacion, Concepcion, Iloilo Activities: Replacement of rotten pole and rehab of kwhr maters We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA HUNYO 20-24, 27-30 KAG HULYO 1, 2022 SA BANWA SANG LEMERY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III magaumpisa ini alas 9:00 AM- 4:00 PM (7 ka oras ang kalawigon) para sa pag-clearing sang linya. Ang petsa kag lugar nga apektado sang sini nga power interruption amo ang masunod: PETSA APEKTADO NGA BARANGAY Hunyo 20, 2022 CapiƱahan, LemeryHunyo 21, 2022 Cabantohan,… Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 15, 2022)

    Date: June 15, 2022 Time of interruption: 11:30 AM Time of restoration: 12:40 PM Affected areas: Batuan and Amayong, San Dionisio, Iloilo Activity: Replacement of busted transformer We apologize for the inconvenience. For your information. Read more

  • IEC AND BAPA ASSEMBLY IN SITIO NABALAS, CULASI, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in Sitio Nabalas, Culasi, Ajuy, Iloilo with 100 attendees on July 27, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, BACJAWAN NORTE, CONCEPCION

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Bacjawan Norte, Concepcion, Iloilo with 104 attendees on July 26, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more

  • ILECO III SAFETY TIPS SA PANAHON SANG TAG-ULAN

    1. Patyon ang Main Switch kung nagabaha na sa inyo lugar. 2. Indi pagtandugon ang mga basa nga wirings sang kuryente. 3. Indi magsaka sa mga kahoy bangud possible nga maglatay ang boltahe sang kuryente sa mga basa nga sanga. 4. Pagkatapos mabahaan ang inyo lugar, indi anay pagbuksan ang main switch. Magtawag sang accredited… Read more

  • INDIVIDUAL PROMPT PAYORS FOR JULY 2022 BILLING

    Thank you to our beloved Member-Consumer-Owners (MCOs) for paying your bills promptly. Keep safe always. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more