• UNSCHEDULED POWER INTERRUPTION (April 1, 2022)

    Date: April 01, 2022 (Friday)Time of interruption: 12:41 PMTIME OF RESTORATION: NOT YET DETERMINED Affected areas: ALL BARANGAYS IN LEMERYSARA – Apelo and Villahermosa only Cause of power outage: Under investigation Our technical team is currently conducting troubleshooting to restore power. Please bear with us during the duration of power restoration activities. We apologized for… Read more

  • EMERGENCY POWER INTERRUPTION SUBONG NGA ADLAW (ABRIL 1, 2022)

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III subong nga adlaw, ABRIL 01, 2022 (BIYERNES), 12:00 NN- 1:00 PM (isa ka oras ang kalawigon) para sa pagkay-o sang primary jumper sa Brgy. Anoring, Sara, Iloilo. Ang lugar nga apektado sang sini nga power interruption sa San Dionisio, Sara kag Concepcion amo… Read more

  • ILECO III POWER ADVISORY: EMERGENCY POWER INTERRUPTION

    Date: March 28, 2022 (Monday) Time of interruption: 12:00 NN Time of restoration: 3:00 PM Affected areas:ALL BARANGAYS IN SAN RAFAELBAROTAC VIEJO: BUGNAYCALIFORNIADELA PEÑALA FORTUNALIPATARIZALSAN ANTONIOSAN GERONIMOSAN LUCASSAN MIGUELUGASAN Activity: To replace damaged pole hit by a vehicleWe apologize for the inconvenience. For your information. Read more

  • IEC AND BAPA ASSEMBLY IN SITIO NABALAS, CULASI, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in Sitio Nabalas, Culasi, Ajuy, Iloilo with 100 attendees on July 27, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, BACJAWAN NORTE, CONCEPCION

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Bacjawan Norte, Concepcion, Iloilo with 104 attendees on July 26, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more

  • ILECO III SAFETY TIPS SA PANAHON SANG TAG-ULAN

    1. Patyon ang Main Switch kung nagabaha na sa inyo lugar. 2. Indi pagtandugon ang mga basa nga wirings sang kuryente. 3. Indi magsaka sa mga kahoy bangud possible nga maglatay ang boltahe sang kuryente sa mga basa nga sanga. 4. Pagkatapos mabahaan ang inyo lugar, indi anay pagbuksan ang main switch. Magtawag sang accredited… Read more

  • INDIVIDUAL PROMPT PAYORS FOR JULY 2022 BILLING

    Thank you to our beloved Member-Consumer-Owners (MCOs) for paying your bills promptly. Keep safe always. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more