• UNSCHEDULED POWER INTERRUPTION (JULY 5, 2022)

    Date: July 05, 2022 Time of interruption: 11:35 AM Time of restoration: 2:43 PM Affected area: Sitio Bacolod, Carmelo, Banate Activity: Replacement of rotten pole and rehab of kwhr meters We apologize for the inconvenience. For your information. Read more

  • UNSCHDULED POWER INTERRUPTION (JULY 5, 2022)

    Date: July 05, 2022 Time of interruption: 7:45 AM Time of restoration: 9:13 AM Affected area: Sitio Gua, Poblacion, Carles, Iloilo Activities: Clearing of lines and re-fusing We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA HULYO 9, 2022 SA BANWA SANG CARLES

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HULYO 09, 2022 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-ilis sang poste kag pag-clearing sang linya (backbone kag lateral lines). Ang lugar nga apektado sang sini nga power interruption sa CARLES amo ang masunod: • Tanan… Read more

  • ENERGY CONSERVATION TIPS!

    AIR CONDITIONING UNIT Buy an aircon with high Energy Efficiency. Ratio indicated in the yellow label. Change or clean your AC’s air filters regularly. Block the sun from overheating your home. Inside, use shades, blinds and drapes.Outside, use awnings, trees and shrubs. Repair leaky ducts to reduce heating and cooling costs. Decorate for a cooler… Read more

  • INDIVIDUAL PROMPT PAYORS FOR JULY 2022 BILLING

    Thank you to our beloved Member-Consumer-Owners (MCOs) for paying your bills promptly. Keep safe always. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, TIPACLA, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Tipacla, Ajuy, Iloilo with 34 attendees on August 04, 2022 (Thursday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • IEC AND BAPA ASSEMBLY IN SITIO DAGA, PROGRESO, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in Sitio Daga, Progreso, Ajuy, Iloilo with 55 attendees on August 03, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more