• UNSCHEDULED POWER INTERRUPTION (JUNE 21, 2022)

    Date: June 21, 2022 Time of interruption: 9:00 AM Time of restoration: 10:00 AM Affected area: Sitio Matingkong, Juanico, Banate, Iloilo Activities: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 21, 2022)

    Date: June 21, 2022 Time of interruption: 10:45 AM Time of restoration: 11:20 AM Affected area: Bancal, Carles, Iloilo (portion) Activities: Replaced secondary jumper of transformer and repaired SDI cut-off We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 21, 2022)

    Date: June 21, 2022 Time of interruption: 9:39 AM Time of restoration: 10:20 AM Affected areas: Dayhagan, Carles, Iloilo Activity: Inspection of line and replaced fuse link We apologize for the inconvenience. For your information. Read more

  • Ano ang Requirements for Change of Name?

    Ari sa idalom ang pagsulondan kung paano mag proseso sang Metro nga gusto mo ipapangalan na sa imo tungod ang tag-iya sang metro nga imo ginagamit nag lakat na (abroad, naghalin sang lokasyon) ukon nagtaliwan na (deceased). Read more

  • HAPPY BIRTHDAY ADMIN JUANEZA!

    Happy birthday Admin. Emmanuel P. Juaneza, Administrator of National Electrification Administration (NEA). From ILECO III Family! National Electrification Administration (NEA) National Electrification Administration Read more

  • LIVE! CEREMONIAL SWITCH-ON OF THE 15TH MILLION CONSUMER ENERGIZED BY AN EC

    Witness the ceremonial switch-on of the 15th million consumer energized by an electric cooperative. https://www.facebook.com/aselco/videos/801883787836401/ Read more

  • Rural electrification at its best!

    Please tune in later to the live streaming of the ceremonial switch-on of the 15th million consumer energized by an electric cooperative. We, in ILECO III, together with the other 120 electric cooperatives (ECs) in the country, will continue to pursue our mandate of countryside development through rural electrification. https://www.facebook.com/OfficialNEA/posts/pfbid02CygcMsZpNk72gLMqpHBr5vZ8Do5oUor9cGJeCkdKuzHpXUCcc19dcKJMfqX16vyql Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more