• EMERGENCY POWER INTERRUPTION TODAY, JULY 8, 2022

    Date: July 08, 2022 (Friday) Time of interruption: 9:07 AMTime of restoration: 9:21 AM Affected areas: Batad (All barangays) and Estancia (portion) Activity: Replacement of damaged pin insulator and suspension insulator in Calapdan, Estancia We apologize for the inconvenience. For your information. Read more

  • MANUAL LAOD DROPPING (MLD) SANG NGCP SUBONG NGA HULYO 7, 2022

    Ginapahibalo ang tanan nga mga katapo-konsumidores sang ILECO III nga mag-preparar sa POSIBLE magaluntad nga power interruption sa inyo nga lugar nga magadugay sang 1-2 oras sugod subong nga gab-I, Hulyo 07, 2022 (Huwebes) para sa pag-implementar sang ROTATING POWER INTERRUPTION sang aton Kooperatiba bangud sang MANUAL LOAD DROPPING (MLD) sang National Grid Corporation of… Read more

  • REFILLING OF SF6 GAS IN DAAN BANWA 69KV CIRCUIT BREAKER TODAY, JULY 7, 2022

    ILECO III personnel conducted and facilitated refilling of SF6 Gas in Daan Banwa 69kv Circuit Breaker, today, July 07, 2022 (Thursday), 12:00 NN- 1:00 PM. We apologize for the inconvenience. For your information. Read more

  • Ano ang Requirements for Change of Name?

    Ari sa idalom ang pagsulondan kung paano mag proseso sang Metro nga gusto mo ipapangalan na sa imo tungod ang tag-iya sang metro nga imo ginagamit nag lakat na (abroad, naghalin sang lokasyon) ukon nagtaliwan na (deceased). Read more

  • HAPPY BIRTHDAY ADMIN JUANEZA!

    Happy birthday Admin. Emmanuel P. Juaneza, Administrator of National Electrification Administration (NEA). From ILECO III Family! National Electrification Administration (NEA) National Electrification Administration Read more

  • LIVE! CEREMONIAL SWITCH-ON OF THE 15TH MILLION CONSUMER ENERGIZED BY AN EC

    Witness the ceremonial switch-on of the 15th million consumer energized by an electric cooperative. https://www.facebook.com/aselco/videos/801883787836401/ Read more

  • Rural electrification at its best!

    Please tune in later to the live streaming of the ceremonial switch-on of the 15th million consumer energized by an electric cooperative. We, in ILECO III, together with the other 120 electric cooperatives (ECs) in the country, will continue to pursue our mandate of countryside development through rural electrification. https://www.facebook.com/OfficialNEA/posts/pfbid02CygcMsZpNk72gLMqpHBr5vZ8Do5oUor9cGJeCkdKuzHpXUCcc19dcKJMfqX16vyql Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more