• SCHEDULED POWER INTERRUPTION SA HULYO 13, 16 KAG 18, 2022 SA BANWA SANG BALASAN

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga clearing sang linya kag pag-ilis sang mga guba nga poste. Ang petsa, oras kag lugar nga apektado sang sini nga power interruption sa BALASAN amo ang masunod: Hulyo 13, 2022 (Miyerkules)9:00 AM- 5:00 PM(8 ka oras ang kalawigon) •… Read more

  • EMERGENCY PLANT SHUTDOWN ANG NATIONAL POWER CORPORATION (NPC)- SPUG SA HULYO 10, 2022

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY PLANT SHUTDOWN ang NATIONAL POWER CORPORATION (NPC)- SPUG sa HULYO 10, 2021 (DOMINGO) 1:00 PM- 5:00 PM (apat ka oras ang kalawigon) para sa pag-install sang bag-o nga FDS connection sang transformer. Ang apektado nga lugar sa ISLA GIGANTES, CARLES amo ang masunod: • Brgy. Asluman• Brgy. Gabi•… Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 8, 2022)

    Date: July 08, 2022 Time of interruption: 5:00 AM Time of restoration: 5:40 AM Affected areas: San Florentino, San Rafael and Rizal, Barotac Viejo Activity: Replaced busted fuse link due to animal contact We apologize for the inconvenience. For your information. Read more

  • Ano ang Requirements for Change of Name?

    Ari sa idalom ang pagsulondan kung paano mag proseso sang Metro nga gusto mo ipapangalan na sa imo tungod ang tag-iya sang metro nga imo ginagamit nag lakat na (abroad, naghalin sang lokasyon) ukon nagtaliwan na (deceased). Read more

  • HAPPY BIRTHDAY ADMIN JUANEZA!

    Happy birthday Admin. Emmanuel P. Juaneza, Administrator of National Electrification Administration (NEA). From ILECO III Family! National Electrification Administration (NEA) National Electrification Administration Read more

  • LIVE! CEREMONIAL SWITCH-ON OF THE 15TH MILLION CONSUMER ENERGIZED BY AN EC

    Witness the ceremonial switch-on of the 15th million consumer energized by an electric cooperative. https://www.facebook.com/aselco/videos/801883787836401/ Read more

  • Rural electrification at its best!

    Please tune in later to the live streaming of the ceremonial switch-on of the 15th million consumer energized by an electric cooperative. We, in ILECO III, together with the other 120 electric cooperatives (ECs) in the country, will continue to pursue our mandate of countryside development through rural electrification. https://www.facebook.com/OfficialNEA/posts/pfbid02CygcMsZpNk72gLMqpHBr5vZ8Do5oUor9cGJeCkdKuzHpXUCcc19dcKJMfqX16vyql Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more