• SCHEDULED POWER INTERRUPTION SA BANWA SANG BANATE

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BANATE amo ang masunod: SETYEMBRE 23, 2024 (LUNES) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) • Sitio Insayawan, Dela Paz •… Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG SAN RAFAEL SA SETYEMBRE 19, 20, KAG 21

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang SAN RAFAEL amo ang masunod: SETYEMBRE 19, 2024 (HUWEBES) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) • Sitio Ulang, San Florentino… Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG BAROTAC VIEJO SA SETYEMBRE 14, 16, 17 KAG 18

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BAROTAC VIEJO amo ang masunod: SETYEMBRE 14, 2024 (SABADO) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) • Sitio Vencer, Sto. Tomas… Read more

  • NINOY AQUINO DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorates Ninoy Aquino Day, August 21, 2022, Sunday “Filipino is Worth Dying For” – Ninoy Read more

  • ILECO III “LOVE ON WHEELS” GOES TO SITIO BALANTAK, SAN JOSE, LEMERY

    In line with the celebration of 13th National Electrification Awareness Month (NEAM), the roving community pantry of ILECO III “Love on Wheels” was conducted today, August 19, 2022 (Friday) in Sitio Balantak, San Jose, Lemery, Iloilo. ILECO III prepared grocery items and snacks and extended assistance to twenty (20) BAPA members of the said recipient… Read more

  • Power Rates for the Month of August 2022

    The INCREASE for the month of August 2022 compared to the previous month is due to the increase of all charges (includes generation, transmission, system loss and lifeline subsidy). The increase in generation is due to the increased charges from Independent Power Producers (IPPs) and the Wholesale Electricity Spot Market (WESM). WESM charges increased by… Read more

  • HAPPY BIRTHDAY NEA ADMIN JUANEZA!

    HAPPY BIRTHDAY NEA ADMINISTRATOR EMMANUEL P. JUANEZA! FROM ILECO III FAMILY! National Electrification Administration https://www.facebook.com/watch/?v=1176753016222117 Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more