• SCHEDULED POWER INTERRUPTION SA BANWA SANG AJUY SA HUNYO 14, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 14, 2024 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-clearing sang linya kag pag-ilis sang Three Phase Line. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang AJUY amo ang: • Culasi •… Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: June 10, 2024 (Monday) Time of interruption: 2:00 PM Time of restoration: 2:30 PM Affected areas: Poblacion (portion), Hamod,Embarcadero, Salong, Cabagohan, Caw-I, Tapian, Binon-an, Tanao and Alinsolong, Batad, Iloilo. Cause: Line fault due to obstruction/contact with Telco pole. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG BAROTAC VIEJO SA HUNYO 8, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 08, 2024 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-convert sang linya kag pag-ilis sang guba nga poste. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang BAROTAC VIEJO amo ang: • Bugnay… Read more

  • NINOY AQUINO DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorates Ninoy Aquino Day, August 21, 2022, Sunday “Filipino is Worth Dying For” – Ninoy Read more

  • ILECO III “LOVE ON WHEELS” GOES TO SITIO BALANTAK, SAN JOSE, LEMERY

    In line with the celebration of 13th National Electrification Awareness Month (NEAM), the roving community pantry of ILECO III “Love on Wheels” was conducted today, August 19, 2022 (Friday) in Sitio Balantak, San Jose, Lemery, Iloilo. ILECO III prepared grocery items and snacks and extended assistance to twenty (20) BAPA members of the said recipient… Read more

  • Power Rates for the Month of August 2022

    The INCREASE for the month of August 2022 compared to the previous month is due to the increase of all charges (includes generation, transmission, system loss and lifeline subsidy). The increase in generation is due to the increased charges from Independent Power Producers (IPPs) and the Wholesale Electricity Spot Market (WESM). WESM charges increased by… Read more

  • HAPPY BIRTHDAY NEA ADMIN JUANEZA!

    HAPPY BIRTHDAY NEA ADMINISTRATOR EMMANUEL P. JUANEZA! FROM ILECO III FAMILY! National Electrification Administration https://www.facebook.com/watch/?v=1176753016222117 Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more