• SCHEDULED POWER INTERRUPTION SA ENERO 5, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa ENERO 05, 2024 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga power interruption sa banwa sang SAN DIONISIO amo ang masunod:• Agdaliran Madamo gid nga salamat sa… Read more

  • SCHEDULED POWER INTERRUPTION SA ENERO 4, 2024 SA BANWA SANG BALASAN

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa ENERO 04, 2024 (HUWEBES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga power interruption sa banwa sang BALASAN amo ang masunod:• Bacolod• Batuan• Cabalic• Dolores• Gimamanay• Malapoc• Poblacion… Read more

  • UNSCHEDULED POWER INTERRUPTION (DECEMBER 26, 2023)

    Date: December 26, 2023(Tuesday) Time of interrption : 6:10 PM Time of restoration : 7:05 PM Affected area: Concepcion Activity: Inspection/clearing of line due to animal contact (gecko) and replace pin insulator. We apologize for the inconvenience. For your information. Read more

  • NINOY AQUINO DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorates Ninoy Aquino Day, August 21, 2022, Sunday “Filipino is Worth Dying For” – Ninoy Read more

  • ILECO III “LOVE ON WHEELS” GOES TO SITIO BALANTAK, SAN JOSE, LEMERY

    In line with the celebration of 13th National Electrification Awareness Month (NEAM), the roving community pantry of ILECO III “Love on Wheels” was conducted today, August 19, 2022 (Friday) in Sitio Balantak, San Jose, Lemery, Iloilo. ILECO III prepared grocery items and snacks and extended assistance to twenty (20) BAPA members of the said recipient… Read more

  • Power Rates for the Month of August 2022

    The INCREASE for the month of August 2022 compared to the previous month is due to the increase of all charges (includes generation, transmission, system loss and lifeline subsidy). The increase in generation is due to the increased charges from Independent Power Producers (IPPs) and the Wholesale Electricity Spot Market (WESM). WESM charges increased by… Read more

  • HAPPY BIRTHDAY NEA ADMIN JUANEZA!

    HAPPY BIRTHDAY NEA ADMINISTRATOR EMMANUEL P. JUANEZA! FROM ILECO III FAMILY! National Electrification Administration https://www.facebook.com/watch/?v=1176753016222117 Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more