
POWER RATES
POWER ADVISORIES
Ang aton mga substations nga na energize ang nag-off line sa liwat subong alas 9:08 a.m. bangud sang pag-tripping sang planta sang PEDC nga nagdulot sang unstable nga supply sang kuryente sa bug-os nga Panay power grid. Sa subong nga ti-on ang mga energized nga mga feeders amo ang mga masunod: Sara Substation- Feeder 4… Read more
ari ang eksplinasyon nahangungod sa pagpatigayon sang MLD sang aton nga Coverage Area. INDI ini kontrolado sang ILECO III bangud kulang ang supply sang kuryente nga ginahatag sang generation apang ang demand nga ginakinahanglan sang aton miyembro-konsumidor ang masobra sa available nga capasidad sang planta. Madamo gid nga salamat sa inyo nga paghangop. Read more
“Visayas grid status, 29 April 2023: At 8:54 AM, NGCP monitored a disturbance. Multiple power plants in Panay disengaged from the transmission system. Parts of the franchise areas of AKELCO , CAPELCO, ANTECO, MORE Power, ILECO I, ILECO II, and ILECO III lost power. NGCP is investigating the root cause of the system disturbance and… Read more
NEWS AND UPDATES
ILOILO III ELECTRIC COOPERATIVE, INC. commemorates Ninoy Aquino Day, August 21, 2022, Sunday “Filipino is Worth Dying For” – Ninoy Read more
In line with the celebration of 13th National Electrification Awareness Month (NEAM), the roving community pantry of ILECO III “Love on Wheels” was conducted today, August 19, 2022 (Friday) in Sitio Balantak, San Jose, Lemery, Iloilo. ILECO III prepared grocery items and snacks and extended assistance to twenty (20) BAPA members of the said recipient… Read more
The INCREASE for the month of August 2022 compared to the previous month is due to the increase of all charges (includes generation, transmission, system loss and lifeline subsidy). The increase in generation is due to the increased charges from Independent Power Producers (IPPs) and the Wholesale Electricity Spot Market (WESM). WESM charges increased by… Read more
HAPPY BIRTHDAY NEA ADMINISTRATOR EMMANUEL P. JUANEZA! FROM ILECO III FAMILY! National Electrification Administration https://www.facebook.com/watch/?v=1176753016222117 Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more