• RE-SCHEDULED PREVENTIVE MAINTENANCE SANG NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP)

    Pahibalo sa mga katapo-konsumidores nga GINSAYLO ANG ORAS sang SCHEDULED PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa MAYO 03, 2025 (SABADO). Ang BAG-O NGA ORAS kag apektado nga lugar sang sini nga power interruption amo ang masunod: MAYO 03, 2025 (SABADO)… Read more

  • SCHEDULED PREVENTIVE MAINTENANCE SANG NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) SA MAYO 3, 2025

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa MAYO 03, 2025 (SABADO). Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: MAYO 03, 2025 (SABADO) 6:00 AM- 6:00… Read more

  • EMERGENCY POWER INTERRUPTION

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III sa ABRIL 23, 2025 (MIYERKULES) 5:00 AM- 6:00 AM (1 ka oras ang kalawigon) para sa pag-ilis sang insulator sa Poblacion Sur, Balasan kag hot spot correction sa Poblacion, Carles. Ang lugar nga apektado sang sini nga power interruption amo ang masunod: Balasan:… Read more

  • NINOY AQUINO DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorates Ninoy Aquino Day, August 21, 2022, Sunday “Filipino is Worth Dying For” – Ninoy Read more

  • ILECO III “LOVE ON WHEELS” GOES TO SITIO BALANTAK, SAN JOSE, LEMERY

    In line with the celebration of 13th National Electrification Awareness Month (NEAM), the roving community pantry of ILECO III “Love on Wheels” was conducted today, August 19, 2022 (Friday) in Sitio Balantak, San Jose, Lemery, Iloilo. ILECO III prepared grocery items and snacks and extended assistance to twenty (20) BAPA members of the said recipient… Read more

  • Power Rates for the Month of August 2022

    The INCREASE for the month of August 2022 compared to the previous month is due to the increase of all charges (includes generation, transmission, system loss and lifeline subsidy). The increase in generation is due to the increased charges from Independent Power Producers (IPPs) and the Wholesale Electricity Spot Market (WESM). WESM charges increased by… Read more

  • HAPPY BIRTHDAY NEA ADMIN JUANEZA!

    HAPPY BIRTHDAY NEA ADMINISTRATOR EMMANUEL P. JUANEZA! FROM ILECO III FAMILY! National Electrification Administration https://www.facebook.com/watch/?v=1176753016222117 Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more