• Update on the ongoing unscheduled power interruption in Natividad Area Coverage as of 8:00 p.m.

    Ongoing repair of the 69kv Disconnect Switch of Natividad Substation is being conducted by our Technical Team. Time of power restoration is not yet determined. We apologize for the inconvenience. For your information, thank you. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 16, 2022)

    What: UNSCHEDULED POWER INTERRUPTIONDate: September 16, 2022 (Friday)Time of interruption: 6:53 PMTime of restoration: NOT YET DETERMINEDAffected areas: ANILAO, BANATE, BAROTAC VIEJO AND SAN RAFAELCause: Loose connection of 69kv disconnect switch of Natividad Substation Our Technical Team is currently troubleshooting the cause of this power interruption. We apologize for the inconvenience. For your information. Read more

  • INSTALLATION OF PRIVATE TRANSFORMER AND LINE CLEARING

    ILECO III Technical personnel conducted installation of private transformer and line clearing at Sitio Salong, San Lucas, Barotac Viejo today, September 15, 2022 (Thursday).(No Power Interruption) Keep safe Warriors of Light For your information. Read more

  • ILECO III TRIVIA Question #5

    Maghatag sang tatlo (3) ka rason sang NATALANA NGA POWER INTERRUPTION: (In any order) Read more

  • SCHEDULE OF DUE DATES AND DISCONNECTION FOR THE MONTH OF SEPTEMBER 2022

    For your information. Read more

  • ILECO III TRIVIA FACT #11

    Transmission – ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Generation Plants pakadto sa mga Distribution Utilities kaangay sang ILECO III. Ini ang nagaserbi bilang “highway” pakadto sa mga substations sang ILECO III. #ILECO3@36#IbaAngMayAlam Read more

  • ILECO III TRIVIA QUESTION #4

    Ano ang portion sang bill nga nagakadto gid lamang sa Distribution Utility kaangay sang ILECO III para magamit sa operasyon kag maintenance expenses. Ini nagabalor PhP 1.4640 halin pag-implementar sang tuig 2009? #ILECOIII@36#IbaAngMayAlam Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more