
POWER RATES
POWER ADVISORIES
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
Time of interruption: 6:54 p.m.Estimated time of power restoration: Not yet determinedAffected Areas: Whole coverage area of ILECO III Our Technical Team is currently coordinating with NGCP for the cause of this power interruption which affected the ENTIRE PANAY ISLAND and MOST PARTS of NEGROS ISLAND. The estimated time of power restoration cannot be determined… Read more
NEWS AND UPDATES
For your information. Read more
Transmission – ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Generation Plants pakadto sa mga Distribution Utilities kaangay sang ILECO III. Ini ang nagaserbi bilang “highway” pakadto sa mga substations sang ILECO III. #ILECO3@36#IbaAngMayAlam Read more
Ano ang portion sang bill nga nagakadto gid lamang sa Distribution Utility kaangay sang ILECO III para magamit sa operasyon kag maintenance expenses. Ini nagabalor PhP 1.4640 halin pag-implementar sang tuig 2009? #ILECOIII@36#IbaAngMayAlam Read more
Generation – ini ang ginakabug-usan sang mga Indepenent Power Producers (IPPs) kaangay sang (SIPC, GCGI, PEDC kag GMPC) nga naga proseso sang pag-produser sang kuryente kag diri nakakontrata ang supply sang kuryente sang ILECO III. #ILECO3@36#IbaAngMayAlam Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more