
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa HUNYO 08, 2022 (MIYERKULES), 1:00 AM- 6:00 AM (5 ka oras ang kalawigon). Ang apektado nga lugar sang power interruption amo ang masunod: • ANILAO• BANATE• BAROTAC VIEJO• SAN RAFAEL… Read more
Date: June 02, 2022 Time of interruption: 3:49 PM Time of restoration: 3:59 PM Affected areas: General Luna, Barotac Viejo, Iloilo Activity: Inspection and replaced busted fuse link We apologize for the inconvenience. For your information. Read more
Date: June 02, 2022 Time of interruption: 11:51 AM Time of restoration: 01:10 PM Affected areas: San Lucas, Barotac Viejo, Iloilo Activity: Inspection and replaced busted fuse link We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
https://www.facebook.com/watch/?v=1951781538351202 Read more
Maghatag sang tatlo (3) ka rason sang NATALANA NGA POWER INTERRUPTION: (In any order) Read more
For your information. Read more
Transmission – ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Generation Plants pakadto sa mga Distribution Utilities kaangay sang ILECO III. Ini ang nagaserbi bilang “highway” pakadto sa mga substations sang ILECO III. #ILECO3@36#IbaAngMayAlam Read more
BIDS AND NOTICES
Procurement of 4X4 Pick Up Vehicle for Area Offices and Utility Van for Main Office Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loan, and Maintenance Use Read more