• UNSCHEDULED POWER INTERRUPTION (OCTOBER 28, 2022)

    Date: October 28, 2022 Time of interruption: 6:13 PM Time of Restoration: 7:15 PM Affected Area: Balantian, Balasan Reason/Activity: Line fault due to heavy rain and lightning surge/ Inspection of line and replaced busted fuse link. We apologize for the inconvenience. For your information. (Photo is pixelated and distorted due to heavy rain) Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 28, 2022)

    Date: October 28, 2022 Time of interruption: 5:24 PM Time of Restoration: 6:48 PM Affected Area: Lawis, Balasan Reason/Activity: Line fault due to secondary jumper cut-off/ Repair secondary jumper cut-off and re-fusing We apologize for the inconvenience. For your information. (Photo is pixelated and distorted due to heavy rain) Read more

  • REPAIR OF SECONDARY JUMPER OF TRANSFORMER LOOSE CONNECTION IN BOTONON, ESTANCIA

    ILECO III Technical personnel repaired the secondary jumper of the transformer loose connection at Brgy. Botongon, Estancia today, October 28, 2022 (Friday). Keep safe Warriors of Light For your information. Read more

  • Trivia Question #8

    Maghatag sang lima (5) ka banwa nga nasakupan sang Sara Area Office (SAO). Read more

  • ILECO III Trivia Fact#16

    Ang apat (4) ka banwa nga yara sa area coverage sang Natividad Area Office ukon (NAO) amo ang mga masunod: AnilaoBanateBarotac ViejoSan Rafael Read more

  • SARADO ANG OPISINA SANG ILECO MAIN OFFICE KAG AREA OFFICES SA SETYEMBRE 26, 2022

    Pahibalo sa mga katapo-konsumidores nga ang ILECO III ang naga-selebrar sang 36th Founding Anniversary sa SETYEMBRE 26, 2022 (LUNES). Bangud sini, SARADO ANG ILECO III MAIN OFFICE kag AREA OFFICES (Sara, Natividad kag Pani-an) sa nasambit nga adlaw.May ara sang assigned on duty maintenance crew sa kada Area Offices para sa pag-responde sa inyo nga… Read more

  • ILECO III Trivia Question #7

    Ano ang tawag sa ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Generation Plants pakadto sa mga Distribution Utilities kaangay sang ILECO III. Ini ang nagaserbi bilang “highway” pakadto sa mga substations sang ILECO III? Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more