
POWER RATES
POWER ADVISORIES
Ang aton mga substations nga na energize ang nag-off line sa liwat subong alas 9:08 a.m. bangud sang pag-tripping sang planta sang PEDC nga nagdulot sang unstable nga supply sang kuryente sa bug-os nga Panay power grid. Sa subong nga ti-on ang mga energized nga mga feeders amo ang mga masunod: Sara Substation- Feeder 4… Read more
ari ang eksplinasyon nahangungod sa pagpatigayon sang MLD sang aton nga Coverage Area. INDI ini kontrolado sang ILECO III bangud kulang ang supply sang kuryente nga ginahatag sang generation apang ang demand nga ginakinahanglan sang aton miyembro-konsumidor ang masobra sa available nga capasidad sang planta. Madamo gid nga salamat sa inyo nga paghangop. Read more
“Visayas grid status, 29 April 2023: At 8:54 AM, NGCP monitored a disturbance. Multiple power plants in Panay disengaged from the transmission system. Parts of the franchise areas of AKELCO , CAPELCO, ANTECO, MORE Power, ILECO I, ILECO II, and ILECO III lost power. NGCP is investigating the root cause of the system disturbance and… Read more
NEWS AND UPDATES
https://www.facebook.com/watch/?v=422170403388941 Read more
https://www.facebook.com/100072581704093/videos/6132627673417279/ Read more
https://www.facebook.com/watch/?v=1398691230662112 Read more
Iloilo III Electric Cooperative, Inc. celebrates World Teachers’ Day, October 5, 2022. A heartfelt thank you to all the teachers who spend their time, energy and love to educate our children. Happy Teachers’ Day! #ModernHeroes#weloveourteachers#ILECO3onTeachersDay2022 Read more
BIDS AND NOTICES
Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more