
POWER RATES
POWER ADVISORIES
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
Time of interruption: 6:54 p.m.Estimated time of power restoration: Not yet determinedAffected Areas: Whole coverage area of ILECO III Our Technical Team is currently coordinating with NGCP for the cause of this power interruption which affected the ENTIRE PANAY ISLAND and MOST PARTS of NEGROS ISLAND. The estimated time of power restoration cannot be determined… Read more
NEWS AND UPDATES
Kinahanglan tinlu-an ang mga appliances para ma-preserba ang kapasidad sini. *A friendly reminder from ILECO III. Read more
ILOILO III ELECTRIC COOPERATIVE, INC. together with the people of Carles in their celebration of Feast of Sta. Teresa de Jesus an Annual Town Fiesta, October 15, 2022. Read more
Pahibalo sa tanan nga member-consumer-owners kag stakeholders sang ILECO III. ANO: Blood Letting Activity DIIN: ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo SAN-O: Oktubre 17, 2022 (8:00 AM – 12:00 NN) Para sa dugang nga kasayuran nahanungod sa mga proseso sa adlaw sang pagdonar sang dugo kag iban pa nga mga kinahanglanon, magpadulong lamang sa… Read more
Mag-gamit sang electric fan sa baylo sang air conditioning system. *A friendly reminder from ILECO III. Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more