
POWER RATES
POWER ADVISORIES
Time of interruption: 6:28 PM Time of Restoration: NOT YET DETERMINED Affected areas: SAN DIONISIO – All barangaysSARA (portion)CONCEPCION- Aglosong We are currently conducting line inspection prior of power restoration for the safety of our Member-Consumer-Owners (MCOs). We apologize for the inconvenience. Read more
Date: November 16, 2022 Time of interruption: 4:10 PM Time of Restoration: 6:35 PM Cause of interruption: Line fault due to lightning surge, gusty wind and heavy rain and vegetation Affected areas: Brgy. Drancalan, Batad We apologize for the inconvenience. For your information. Read more
Date: November 16, 2022 Time of interruption: 4:10 PM Time of Restoration: 5:25 PM Cause of interruption: Line fault due to lightning surge, gusty wind and heavy rain. Affected areas: Sitio Lampirong, Poblacion, Batad We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
ILOILO III ELECTRIC COOPERATIVE, INC. joins our Member-Consumer-Owners in remembering our Saints and Souls departed. Let us pray, Eternal rest rest grant unto them O Lord and Let perpetual light shine upon them. Read more
Despite of the bad weather and heavy rains due to Typhoon Paeng, the Medical Mission was held at ILECO III Covered Gym on Friday, October 28, 2022. It was spearheaded by our General Manager Atty. James G. Balsomo II with ILECO III personnel. This activity aims to help our Member-Consumer-Owners (MCOs) and also their family… Read more
Pagkatapos mabahaan ang inyo lugar, indi anay pag-buksan ang main switch. Magtawag sang accredited electrician para macheck ang inyo linya. Keep safe our beloved Member-Consumer-Owners! Read more
Indi pagtandugon ang mga basa nga wirings sang kuryente. Keep safe our beloved Member-Consumer-Owners! Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more