
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more
NEWS AND UPDATES
4 Days till Christmas! A Seasons Greetings! from ILECO 3 FAMILY! Read more
Department of Energy together with National Electrification Administration and ILOILO III ELECTRIC COOPERATIVE, INC. celebrates the National Energy Consciousness Month (NECM) with the theme: “DOE@50: Spearheading a Sustainable Energy Future.” Read more
5 Days till Christmas! A Seasons Greetings! from ILECO 3 FAMILY! Read more
Pahibalo sa mga katapo-konsumidores nga maga- selebrar ang opisina sang ILECO III sang YEAR-END THANKSGIVING PARTY sa DISYEMBRE 23, 2022 (BIYERNES). Bangud sini, SARADO ang ILECO III MAIN OFFICE kag AREA OFFICES (Sara, Natividad kag Pani-an) sa nasambit nga adlaw humalin 1:00 sang hapon. May ara sang assigned on duty maintenance crew sa kada Area Read more
BIDS AND NOTICES
Procurement of 4X4 Pick Up Vehicle for Area Offices and Utility Van for Main Office Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loan, and Maintenance Use Read more