• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 22, 2022)

    Date: September 22, 2022 Time of interruption: 5:35 AM Time of Restoration: 6:16 AM Affected Area: Brgy. Zaragosa, Balasan Activity: Inspection of line and replaced fuselink We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA SETYEMBRE 24 KAG 28, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-construct sang Double Circuit line halin sa Poblacion, Banate pakadto sa Carmelo, Banate. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BANATE amo ang masunod: PETSA , ORAS KAG APEKTADO NGA LUGAR SETYEMBRE 24,… Read more

  • ILECO III POWER ADVISORY (Update as of 9:20 p.m.)

    What: UNSCHEDULED POWER INTERRUPTION Date: September 16, 2022 (Friday) Time of interruption: 6:53 PM Time of restoration: 9:10 PM Affected areas: ANILAO, BANATE, BAROTAC VIEJO AND SAN RAFAEL Cause: Loose connection of 69kv disconnect switch of Natividad Substation Thank you for bearing with us. We apologize for the inconvenience. For your information. Read more

  • HAPPY BIRTHDAY MAYOR BELLEZA!

    Happy birthday HON. ROBERTO T. BELLEZA, JR., Mayor, Municipality of San Rafael, Iloilo. From ILECO III Family! Read more

  • A New Year’s message from Atty. James G. Balsomo II

    Happy New Year to our Member-Consumer-Owners of ILOILO III ELECTRIC COOPERATIVE, INC.! https://www.facebook.com/watch/?v=2849552495178517 Read more

  • Season’s Greetings

    Sa tanan naton nga mga Member-Consumer-Owners (MCOs), ang aton nga kooperatiba ang naga-panamyaw sa inyo tagsa ka pamilya sang malipayon kag matawhay nga pagsa-ulog sang pagkari sang aton Mahal nga Ginoong Jesukristo kag pagsugata sang bag-ong tuig 2023. Kabay sa pagsa-ulog sang aton tagsa ka pamilya, aton ibutang sa sentro sang aton selebrasyon ang aton… Read more

  • HAPPY NEW YEAR!

    Greetings coming from ILECO III Board of Directors. Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more