• SCHEDULED POWER INTERRUPTION SA SETYEMBRE 15-17 KAG 19-24, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga pag-clearing sang mga linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: SETYEMBRE 15, 2022 (HUWEBES)8:00 AM- 4:00 PM (8 ka oras ang kalawigon) • Sitio Progwan kag Proper, Domingo, Sara SETYEMBRE… Read more

  • KANSELADO ANG SCHEDULED POWER INTERRUPTION SUBONG NGA AGA SETYEMBRE 12, 2022

    Pahibalo sa mga katapo-konsumidores nga KASELADO ang SCHEDULED POWER INTERRUPTION sang ILECO III para sa pag-replace sang mga rotten poles sa Brgy. Capiñahan, Lemery subong nga aga Setyembre 12, 2022 alas 8:00 AM tubtob alas 5:00 PM. Madamo guid nga salamat sa inyo paghangup. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 8, 2022)

    Date: September 8, 2022 Time of interruption: 7:21 PM Time of Restoration: 7:44 PM Affected Area: Binon-an, Alinsolong and Ban-Ban, Batad Activity: Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • HAPPY BIRTHDAY HON. PRESLEY!

    Happy birthday HON. PRESLEY C. DE JESUS, Representative, PHILRECA Party-List. From ILECO III Family! Read more

  • HAPPY BIRTHDAY MAYOR BELLEZA!

    Happy birthday HON. ROBERTO T. BELLEZA, JR., Mayor, Municipality of San Rafael, Iloilo. From ILECO III Family! Read more

  • A New Year’s message from Atty. James G. Balsomo II

    Happy New Year to our Member-Consumer-Owners of ILOILO III ELECTRIC COOPERATIVE, INC.! https://www.facebook.com/watch/?v=2849552495178517 Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more