• Update on the ongoing unscheduled power interruption in Natividad Area Coverage as of 8:00 p.m.

    Ongoing repair of the 69kv Disconnect Switch of Natividad Substation is being conducted by our Technical Team. Time of power restoration is not yet determined. We apologize for the inconvenience. For your information, thank you. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 16, 2022)

    What: UNSCHEDULED POWER INTERRUPTIONDate: September 16, 2022 (Friday)Time of interruption: 6:53 PMTime of restoration: NOT YET DETERMINEDAffected areas: ANILAO, BANATE, BAROTAC VIEJO AND SAN RAFAELCause: Loose connection of 69kv disconnect switch of Natividad Substation Our Technical Team is currently troubleshooting the cause of this power interruption. We apologize for the inconvenience. For your information. Read more

  • INSTALLATION OF PRIVATE TRANSFORMER AND LINE CLEARING

    ILECO III Technical personnel conducted installation of private transformer and line clearing at Sitio Salong, San Lucas, Barotac Viejo today, September 15, 2022 (Thursday).(No Power Interruption) Keep safe Warriors of Light For your information. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • HAPPY BIRTHDAY HON. PRESLEY!

    Happy birthday HON. PRESLEY C. DE JESUS, Representative, PHILRECA Party-List. From ILECO III Family! Read more

  • HAPPY BIRTHDAY MAYOR BELLEZA!

    Happy birthday HON. ROBERTO T. BELLEZA, JR., Mayor, Municipality of San Rafael, Iloilo. From ILECO III Family! Read more

  • A New Year’s message from Atty. James G. Balsomo II

    Happy New Year to our Member-Consumer-Owners of ILOILO III ELECTRIC COOPERATIVE, INC.! https://www.facebook.com/watch/?v=2849552495178517 Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more