• MAY SCHEDULED PREVENTIVE MAINTENANCE ANG NGCP SA ENERO 7, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Transmission Line Section sa ENERO 07, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 4:00 AM- 5:00 AM (1 ka oras ang kalawigon)KAG5:00 PM-… Read more

  • UNSHEDULED POWER INTERRUPTION (DECEMBER 27, 2022)

    Date: December 27, 2022 (Monday) Time of interruption: 10:42 AM Time of restoration: 11:52 AM Affected area: Sitio Piliwan, Luca, Ajuy, Iloilo Activity: installation of 25 KVA distribution transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (DECEMBER 27, 2022)

    Date: December 27, 2022 Time of interruption : 6:05 AM Time restored : 6:50 AM Affected area : Sitio Nabitasan, Poblacion, Balasan, Iloilo Activity : Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • ILECO III WEATHER ADVISORY

    Ginapahibalo ang tanan nga mga miyembro-konsumidores sang ILECO III nga kita ang gaka-ekperiensya sang madamol nga pag-ulan sa iban nga bahin sang aton franchise coverage. Kita tanan ang mag-halong para sa aton seguridad kag pamilya. May ara kita Maintenance Team nga naka-assign sa tanan nga Area Offices para sa pag-restore sang power sa mga apektado… Read more

  • ILECO III POWER RATES FOR THE MONTH OF JANUARY 2023

    Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • REQUIREMENTS FOR CHANGE OF NAME

    DECEASED MEMBER CONSUMER1. For Spouse Applicants• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III signedby Punong Barangay• Marriage Contract• Proof of Ownership – (e.g. deed of sale, affidavit ofheirship) (if available) 2. For Legal Heirs• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III• Notarized Waiver of Rights stating that the othersuccessors are not… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more