• EMERGENCY POWER INTERRUPTION (NOVEMBER 1, 2022)

    Date: November 1, 2022 Time of interruption: 8:12 AM Time of Restoration: 8:42 AM Affected Area: Whole Feeder 1 of Sara Substation (Brgys of Sara and San Dionisio) Afftected Areas: Sara Substation (Feeder 1)Sara: Aldeguer and Castor (Portion)San Dionisio: Dugman, Tuble, San Nicolas, Cudionan, Had. Conchita, Sua, Tiabas, Cubay, Bagacay, Agdaliran, Borongon, Manduawak, Talo-ato, Batuan,… Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 31, 2022)

    Date: October 31, 2022 Time of interruption: 8:55 PM Time of Restoration: 9:15 PM Affected Area: NHA Village, Magdalo, Banate Reason/Activity: Line fault due to damage of secondary bushing/ Inspection and repaired damaged secondary bushing. We apologize for the inconvenience. For your information. Read more

  • TROUBLESHOOTING OF FEEDER 1 LINE FAULT SUSPENSION INSULATR CENTER PHASE C8 IN DEVERA, SARA

    ILECO III Technical personnel troubleshoot Feeder 1 line fault suspension insulator center phase C8 at Brgy. Devera, Sara, today October 31, 2022 (Monday). Keep safe Warriors of Light For your information. Read more

  • ACCREDITED THIRD PARTY COLLECTION CENTERS

    PAHIBALO SA MGA KATAPO-KONSUMIDORES Ang tanan nga individual consumers ang pwede makabayad sa mga masunod nga accredited payment centers:PAYMAYAECPAYLINK.BIZPORTALUNION BANKSEVEN ELEVENFIRST CONSOLIDATED BANK- ESTANCIA BRANCHGCASHBDO NETWORK BANK- ESTANCIA AND SARA BRANCHRD PAWNSHOPM LHUILLIERUNIFIED GPRSPALAWAN PAWNSHOPRURAL BANK OF ANILAO, INC.BDO UNIBANKRCBC Samtang ang tanan nga BAPA Members ang kinahanglan nga magbayad sa inyo natungdan nga BAPA.… Read more

  • ENERGY CONSERVATION TIPS!

    AIR CONDITIONING UNIT Buy an aircon with high Energy Efficiency. Ratio indicated in the yellow label.Change or clean your AC’s air filters regularly.Block the sun from overheating your home. Inside, use shades, blinds and drapes.Outside, use awnings, trees and shrubs.Repair leaky ducts to reduce heating and cooling costs.Decorate for a cooler home by hanging light-colored… Read more

  • SCHEDULE OF DUE DATES AND DISCONNECTION FOR THE MONTH OF JANUARY 2023

    For your information. Thank you! Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa mga katapo-konsumidores nga pagakwa-on ang tanan nga mga unauthorized cables/wires sang mga unregistered Telco/Internet Providers nga naga-attach sa ILECO III distribution lines kag poles nga wala sang pahanugot halin sa aton kooperatiba. Ang opisina ang magahatag lamang sang plaso asta sa Enero 31, 2023 (Martes) para makuha ang mga cables/wires. Dugang diri, kung… Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more