• UNSCHEDULED POWER INTERRUPTION (April 1, 2022)

    STATUS: RESTOREDDate: April 01, 2022 (Friday)Time of interruption: 12:41 PMTIME OF RESTORATION: 2:48 PMAffected areas: ALL BARANGAYS IN LEMERYSARA – Apelo and Villahermosa onlyCause of power outage: Line fault due to obstruction of Telco Lines We apologized for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (April 1, 2022)

    Date: April 01, 2022 (Friday)Time of interruption: 12:41 PMTIME OF RESTORATION: NOT YET DETERMINED Affected areas: ALL BARANGAYS IN LEMERYSARA – Apelo and Villahermosa only Cause of power outage: Under investigation Our technical team is currently conducting troubleshooting to restore power. Please bear with us during the duration of power restoration activities. We apologized for… Read more

  • EMERGENCY POWER INTERRUPTION SUBONG NGA ADLAW (ABRIL 1, 2022)

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III subong nga adlaw, ABRIL 01, 2022 (BIYERNES), 12:00 NN- 1:00 PM (isa ka oras ang kalawigon) para sa pagkay-o sang primary jumper sa Brgy. Anoring, Sara, Iloilo. Ang lugar nga apektado sang sini nga power interruption sa San Dionisio, Sara kag Concepcion amo… Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save… Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • BAPA JOINT MEETING IN BRGY. TALOKGANGAN, BANATE

    LOOK: ILECO III personnel conducted BAPA Joint Meeting held at Tito Paps, Brgy. Talokgangan, Banate with 131 Attendees from different BAPA Association from Natividad Area Coverage last January 11, 2023 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more