• EMERGENCY POWER INTERRUPTION

    Date: May 21, 2024 (Tuesday) Time of interruption: 2:00 AM Estimated time of restoration: NOT YET DETERMINED Affected areas: Pantalan, Binuluangan & Tabugon, Carles, Iloilo Activity: On-going replacement of cut-off primary lines Cause: Marine overhead primary line cut caused by fishing boat For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG BAROTAC VIEJO SA MAYO 22, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa MAYO 22, 2024 (MIYERKULES), 8:00 AM- 12:00 NOON (4 ka oras ang kalawigon) para sa pag-install sang cut-out sa tapping pole para sa Sitio Electrification Project (SEP). Ang lugar nga apektado sang sini nga power interruptions sa banwa sang BAROTAC VIEJO amo Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: May 15, 2024 Time of interruption: 9:37 AM Time of restoration: 10:38 AM Affected area: Poblacion, San Dionisio, Iloilo (portion) Activity: Upgrading of distribution transformer For your information. Read more

  • Ano ang Manual Load Dropping ukon MLD?

    Ini ang proseso nga kung sa diin gina-buhinan ang power load sa grid bangud sa kakulangan sang supply sang kuryente nga masami matabo kung may mga naguba nga planta kadungan sang pag-taas sang supply sang pag-gamit sang kuryente. Bangud diri, ginapatigayon ang MLD pina-agi sa “rotational brownout” sa nagaka-igo nga oras sa nasakupan nga lugar Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • ITB 2404, S. 2024

    Refurbishment of Roofing, Glass Counters and Repainting of Sara Area Office. Read more

  • ITB 2403, S. 2024

    Procurement and Supply of Six (6) Units Service Vehicle for Maintenance Use in Area Offices. Read more

  • ITB 2402, S. 2024

    Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditures Read more